Building a new kitchen or renovating an old one is an exciting and rewarding experience.  At Complete Kitchens we aim to design, manufacture and install a quality kitchen with a minimum of fuss.  (A design and manufacture only service is also available for those who wish to install themselves.)

The lead time in manufacturing a kitchen is typically around six to eight weeks from the date of signing your contract.  More time is required if you opt for timber, stone or other solid material bench-tops (these are not manufactured until the cabinets have been installed).  

before the make over

after the makeover

Typical Stages in Installing a Laminate/Melamine Kitchen

        • Day one – Ripout and first fix trades
        • Day two and three – Kitchen installed
        • Day four – Reconnection of electrical and plumbing items and second fix trades
        • Day five – Tiling commences/ splashbacks installed